Latest Forum Topics / Vard | Post Reply |
Vard Holdings
|
|||||
WanSiTong
Master |
12-Aug-2013 17:06
|
||||
x 0
x 0 Alert Admin |
Finally last done : 0.885. Shortists last minute cover !!? |
||||
Useful To Me Not Useful To Me | |||||
eaton1977
Member |
12-Aug-2013 16:15
|
||||
x 0
x 0 Alert Admin |
Good luck and cheong above 1
|
||||
Useful To Me Not Useful To Me | |||||
|
|||||
starlene
Elite |
12-Aug-2013 14:47
|
||||
x 0
x 0 Alert Admin |
Hope the worst is over for VARD and now resume its climb again..   Vard Holdings Ltd | PDF  Brazilian coup  VARD SP / VARD.SI | NEUTRAL - Maintained | S$0.84 - Tgt. S$0.91  Mkt.Cap: US$783.20m | Avg.Daily Vol: US$5.87m | Free Float: 44.40%  Offshore & Marine | Author(s): Zhi Bin YEO,  ▊ After some waiting, Vard has finally secured a blockbuster order for four pipelay support vessels worth NOk6.5bn or US$1.1bn,  representing its largest win ever.Factoring this in, we raise our FY13-15 EPS by 3-7%. Our target price, still at 9x CY14 P/E (mean since IPO), rises on our EPS upgrade. However, until investors are fully convinced that execution hiccups in Brazil are fully over, we think a sustained re-rating is unlikely. Hence, our unchanged Neutral rating.  What Happened  Vard has secured an order for four pipelay support vessels (PLSVs) worth NOK6.5bn (US$1.1bn) from the DOF Subsea-Technip JV. Once constructed, these vessels will be chartered out to Petrobras. Two of the vessels, of the VARD 3 05 design, will be delivered from Vard's European operations in 2Q16 and 3Q16 respectively. Another two, of the VARD 3 16 design, will be delivered from Vard Promar in 4Q16 and 2Q17 respectively. The VARD 3 05 vessel will be larger with higher specs. It will measure 151m in length and 30m in breadth, and will carry pipelay towers rated at 650 tonnes. The Brazilian-built VARD 3 05 vessel will measure 139.9m in length and 28m in breadth, and will have 340-tonne capacity.  What We Think  Vard has clinched NOK10.5bn of orders YTD, meeting our target of NOK11bn for the year. We now raise our target to NOK14bn. Owing to fierce competition, we believe margins for the four vessels could be on the lower side, though not diluting the group?s blended profitability too much. We retain our EBITDA-margin expectations of 8% for FY14 and 9% for FY15.Vard has a longstanding relationship with DOF-Technip and is the first and only yard to have successfully delivered two Brazilian-built PLSVs. We think the win demonstrates that Norwegian yards still have a competitive edge in high-end offshore production. Given its recent execution hiccups in Brazil, we are also comforted that the Brazilian-built vessels will have a longer delivery lead time.  What You Should Do  Stay Neutral on a 12-month horizon. We would revisit the stock on stronger orders and earnings.  |
||||
Useful To Me Not Useful To Me | |||||
eaton1977
Member |
12-Aug-2013 14:15
|
||||
x 0
x 0 Alert Admin |
Good luck and cheong above 1
|
||||
Useful To Me Not Useful To Me | |||||
serialain
Member |
12-Aug-2013 14:15
|
||||
x 0
x 0 Alert Admin |
Great volume so far! | ||||
Useful To Me Not Useful To Me | |||||
|
|||||
ozone2002
Supreme |
12-Aug-2013 14:06
|
||||
x 1
x 1 Alert Admin |
targetting gap closure @ 99.5c gd luck dyodd
|
||||
Useful To Me Not Useful To Me | |||||
GorgeousOng
Elite |
12-Aug-2013 13:46
Yells: "Hehehaha...enjoy life n live to the fullest..." |
||||
x 0
x 0 Alert Admin |
Scary mouse are dancing now!!! | ||||
Useful To Me Not Useful To Me | |||||
halleluyah
Elite |
12-Aug-2013 12:52
|
||||
x 0
x 1 Alert Admin |
Hidding their face aredi....lol.
|
||||
Useful To Me Not Useful To Me | |||||
|
|||||
NoMoney
Veteran |
12-Aug-2013 12:47
|
||||
x 0
x 0 Alert Admin |
haha that's y I don't like to change Nick.. stay with the same Nick till I forget the password
|
||||
Useful To Me Not Useful To Me | |||||
krisluke
Supreme |
12-Aug-2013 12:30
|
||||
x 0
x 0 Alert Admin |
VARD Bags Contracts for Four PipelayersPosted on Aug 12th, 2013
The contracts constitute the largest order in VARD?s history, with an aggregate order value of approximately USD 1.1 billion (NOK 6.5 billion). Two of the vessels, of VARD 3 05 design, will be delivered in 2Q 2016 and 3Q 2016 respectively. The hulls of these vessels will be built at Vard Tulcea in Romania and outfitted at Vard Søviknes in Norway. The other two vessels, of VARD 3 16 design, will be delivered from Vard Promar in Brazil, in 4Q 2016 and 2Q 2017 respectively. The award of these prestigious contracts reinforces VARD?s position as a leading provider of large and complex Offshore Subsea Construction Vessels (OSCVs). Through this order, VARD is able to capitalize on its track record, experience and world‐ class design capabilities in Norway as well as its long‐ standing presence and investments in the Brazilian market. The new designs have been developed in close cooperation with DOF and Technip. The Norwegian built vessels will carry pipe lay towers rated at 650 tons, among the largest ever in the industry. At 340 tons, the Brazilian built vessels will be among the most  complex vessels ever constructed in Brazil. Topside equipment for all four ships will be delivered by Huisman of the Netherlands. CEO and Executive Director Roy Reite commented, ?I look forward to working with DOF and Technip on these milestone  projects. VARD yards in both Europe and Brazil being chosen to build these vessels illustrates the value of having a global  presence when working with international clients, and bringing leading edge technology to new markets.? |
||||
Useful To Me Not Useful To Me | |||||
krisluke
Supreme |
12-Aug-2013 12:27
|
||||
x 0
x 0 Alert Admin |
Vard Holdings Limited - Morgan Stanley sold 1,410,000 shares as of 6 Aug [last 57,679,000 or 4.8881%] |
||||
Useful To Me Not Useful To Me | |||||
krisluke
Supreme |
12-Aug-2013 12:25
|
||||
x 0
x 0 Alert Admin |
Vard: Secured an aggregate of NOK 6.5b worth of contracts in a JV agreement with DOF Subsea and Technip for the design and construction of four pipe lay support vessels. The four vessels will have an expected delivery between 2Q16 and 2Q17. This is compared to NOK 4b worth of orders secured year-to-date, and will bring order book to ~NOK20.5b. Two vessels of VARD 3 05 design will be built at its Romania yard, Vard Tulcea, and outfitted at Vard Soviknes, Norway. The expected delivery will be in 2Q16 and 3Q16. The other two vessels of VARD 3 16 design will be built at Vard Promar, Brazil, with an expected delivery in 4Q16 and 2Q17. Vard currently trades at 8x forward P/E and 1.4x P/B. |
||||
Useful To Me Not Useful To Me | |||||
|
|||||
krisluke
Supreme |
12-Aug-2013 12:22
|
||||
x 1
x 0 Alert Admin |
After some waiting, Vard has finally secured a blockbuster order for four pipelay support vessels worth NOk6.5bn or US$1.1bn, representing its largest win ever.
Factoring this in, we raise our FY13-15 EPS by 3-7%. Our target price, still at 9x CY14 P/E (mean since IPO), rises on our EPS upgrade. However, until investors are fully convinced that execution hiccups in Brazil are fully over, we think a sustained re-rating is unlikely. Hence, our unchanged Neutral rating. What Happened
Vard has secured an order for four pipelay support vessels (PLSVs) worth NOK6.5bn (US$1.1bn) from the DOF Subsea-Technip JV. Once constructed, these vessels will be chartered out to Petrobras. Two of the vessels, of the VARD 3 05 design, will be delivered from Vard's European operations in 2Q16 and 3Q16 respectively. Another two, of the VARD 3 16 design, will be delivered from Vard Promar in 4Q16 and 2Q17 respectively. 
The VARD 3 05 vessel will be larger with higher specs. It will measure 151m in length and 30m in breadth, and will carry pipelay towers rated at 650 tonnes. The Brazilian-built VARD 3 05 vessel will measure 139.9m in length and 28m in breadth, and will have 340-tonne capacity.
Vard has clinched NOK10.5bn of orders YTD, meeting our target of NOK11bn for the year. We now raise our target to NOK14bn. Owing to fierce competition, we believe margins for the four vessels could be on the lower side, though not diluting the group?s blended profitability too much. We retain our EBITDA-margin expectations of 8% for FY14 and 9% for FY15.
Vard has a longstanding relationship with DOF-Technip and is the first and only yard to have successfully delivered two Brazilian-built PLSVs. We think the win demonstrates that Norwegian yards still have a competitive edge in high-end offshore production. Given its recent execution hiccups in Brazil, we are also comforted that the Brazilian-built vessels will have a longer delivery lead time.
What You Should Do
Stay Neutral on a 12-month horizon. We would revisit the stock on stronger orders and earnings. (Read Report)
|
||||
Useful To Me Not Useful To Me | |||||
warrenbegger
Elite |
12-Aug-2013 11:58
Yells: "Anyhow Buy Anyhow Die ^_^" |
||||
x 0
x 2 Alert Admin |
Those like to talk rubbish one where r they now? They only know how to talk rubbish and after that hide and change nick again  when they r wrong... -Grazt to those that vest at low bottom, cheers :) |
||||
Useful To Me Not Useful To Me | |||||
eaton1977
Member |
12-Aug-2013 11:55
|
||||
x 0
x 0 Alert Admin |
Need another 1billion usd contract to push up the price
|
||||
Useful To Me Not Useful To Me | |||||
rabbitfoot
Veteran |
12-Aug-2013 11:42
|
||||
x 0
x 0 Alert Admin |
Should be by end 2013 and not 2014. And that's Double confirm :)
|
||||
Useful To Me Not Useful To Me | |||||
rabbitfoot
Veteran |
12-Aug-2013 11:39
|
||||
x 0
x 0 Alert Admin |
Mgnt confirmed 12 to 14 bil nok by end 2014. So far 10 bil nok order. Another 4 bil in 4.5 months time. That interview report by Kim eng just beside my pillow | ||||
Useful To Me Not Useful To Me | |||||
eaton1977
Member |
12-Aug-2013 11:38
|
||||
x 0
x 0 Alert Admin |
Hold this baby till 1.22 and above
|
||||
Useful To Me Not Useful To Me | |||||
WanSiTong
Master |
12-Aug-2013 11:36
|
||||
x 0
x 0 Alert Admin |
GreatWall break! Last done 0.865 Huat ah!
|
||||
Useful To Me Not Useful To Me | |||||
WanSiTong
Master |
12-Aug-2013 10:57
|
||||
x 0
x 0 Alert Admin |
Hope it can be cleared! Huat ah!
|
||||
Useful To Me Not Useful To Me |